Description
Monkton Farleigh Mine 1943 Flyer- Secret UK Installation
3 pages- 6 panel, about 11" x 8",flyer. New color re-print restored and digitally enhanced from a nice original. Printed on high quality 20# 97 bright acid free paper. Fully Illustrated.
<p>In the 1930s, it was recognised that there was a need to provide secure storage for munitions across the United Kingdom. The proposal was to create three Central Ammunition Depots (CADs): one in the north (Longtown, Cumbria); one in the Midlands (Nesscliffe, Shropshire); and one in the south.</p><p>The easily-hewn Bath stone, a form of limestone, had created a number of large, horizontal, and relatively dry quarries around Corsham. Monkton Farleigh quarry was renovated from the late 1930s by the Royal Engineers as one of the three major stockpiles.</p><p>In November 1937 the Great Western Railway were contracted to build a 1,000 feet (300 m) long raised twin-loading platform at Shockerwick, with two sidings from the adjacent Bristol-London mainline branching off just outside the eastern entrance to the Box Tunnel at 51°24�19.31�N 2°17�22.94�W. 30 feet (9.1 m) below and at right angles to this point, the War Office had built a narrow gauge wagon sorting yard. This was attached by a 1.25 miles (2.01 km) tunnel built by the Cementation Company, descending at a rate of 1:8.5 to the Central Ammunition Depot, housed in the former mine workings. The whole logistics operation was designed to cope with a maximum of 1,000 tonnes (1,100 tons) of ammunition a day.</p><p>The narrow gauge trucks would descend from the platform to the tunnel, where a heavy-duty conveyor belt would propel the ammunition directly to the appropriate storage gallery. At any given time the depot was either taking in ammunition or sending it out, never both simultaneously. The construction design meant that an explosive accident or detonation inside any one of the stores would not propagate throughout the ammunition storehouse. The conveyor belt, and the original cable-way used as a temporary installation while the tunnel was being built, ran continuously for 30 days in the run-up to D-Day.</p><p>CAD Monkton Farleigh closed at the end of hostilities, although was kept in an operational condition until the 1950s. The sidings were then cleared, and not used again until the mid-1980s when a museum opened for a short period on the site. Today the north end of the tunnel is sealed by a concrete and rubble installation, while the former mine/CAD is used for secure commercial document storage.</p>
We are not affiliated with any arms or gun manufacturer.